Posts

Showing posts with the label 1-19-2022

Turkey Creek Ph 2 - Interceptor

Image
7:05am- crew is back to lay more pipe today here at MH E56.  8:24am- 1st joint of pipe for today is in.  10:06am- 2nd joint in place.  10:35am- grading gravel for #3.  11:55am- 3rd is in and still digging on the 4th joint.  12:50pm- 4th now placed and getting gravel.  1:53pm- graveling grade for # 5.  3:10pm- #6.  4:05pm- 7th joint for today arrives us at MH E55 location. Pipe getting gravel now.  4:22pm- barricades are up now as crew winds down for the day.