Posts

Showing posts with the label 2-7-2022

Turkey Creek Ph 2 - Interceptor

Image
7:10am- slow start with all the snow still onsite, but more digging and pipe laying to come today.  8:02am- 1st joint going in as gasket is cleaned before installing.  9:58am- 3rd joint getting placed.  10:33am- 4th is now in place.   11:45am- 5th is placed with rock now showing.  1:03pm- 6th joint placed.  2:11pm- 7th is placed and more rock breaking occurring.  3:25pm- still on #7. Still breaking rock. I’ll be offsite rest of the day.