Posts

Showing posts with the label 11-17-2021

Turkey Creek Ph 2 - Interceptor

Image
6:51am- more dirt will be pushed over the grass here near MH E11 today.  7:38am- we are marking out all the riprap areas for drainage this morning.  8:27am- crew is back to flushing and checking line again today.  12:00pm- crew is now working to get Ph 1 up to par here at MH A26.  12:55pm- 2nd load of dirt now here to be spread out.  Seed that will be placed.  1:10pm- leveled and seeded.  1:50pm- More Ph 1 leveling work on Rittenhouse below Tom Heads property.  2:20pm- almost done. A mini excavator will be brought in tomorrow to finish up final grading, seeding and straw.  4:23pm- more grade work on Ph 2 is being done near MH E15.  4:50pm- more gravel coming out of line at E16 MH.