Turkey Creek Ph 2 - Interceptor
6:48am- crew will be working to assess the debris build up in the pipe and begin cleaning it out.
9:22am- a load of manholes came in so crew got those unloaded. Now they are popping lids to see about rock throughout the pipe.
MH E30-
10:25am- digging by hand at end of pipe at MH E33 location to get plug into pipe to stop water flow.
-11:30am- 12:30pm: unloaded more manholes at top by bridge.
1:25pm-crew has now lowered pump with shorter hose after removing the full length from being buried and damaging it.
3:05pm- a lot of hand work occurring…
4:30pm- a wire grate is getting cut to allow for water to pass when flushing out lines tomorrow.