Turkey Creek Ph 2 - Interceptor
6:46am- water will be pumped first thing as crew will lat more pipe today. They are about 120’ or so away from setting E4 MH today.
8:55am- 1st joint in and prepping for the second.
10:38am- 3rd joint placed as pump gets moved again.
11:57am- 5th joint placed along with backfill going in.
2:11pm- 7th now placed.
3:51pm- MH E4 is now set with a 10.5’ piece tying it to the main line. 108.5’ of pipe now placed so far today.
Line is lamped by laser back to MH E3.
5:04pm- 1st joint out of E4 will mow go in and this will wrap up the day.
Comments
Post a Comment