7:08am- crew will continue with RipRap here at MH E11-E12 today as well as more strapping of manholes along the route.
8:29am- Strapping now occurring at MH E12.
9:53am- dirt is getting spread near MH E7.
10:58am-MH E12 now backfilled around and more riprap to be placed here at E11.
11:54am- more rings getting bolted down today.
2:00pm- more gravel to be removed feom MH E18 today after flushing the line again.
3:54pm- more dirt is being hauled in to MH E6-E7 areas.
4:13pm- walked field under bridge to look at “clover” coming up, but was unable to locate any.
4:57pm- dirt still being applied.