Turkey Creek Ph 2 - Interceptor
Crew will start laying pipe again today at MH E56 going downstream.
7:42am- crew still awaiting the arrival of the excavator so that digging can begin here at MHE 56.
7:57am- excavator has arrived.
8:38am- digging is now underway at MH E56.
10:27am- grade is checked at MH E56 location. More digging to occur.
1:45pm- MH E56 base is now getting placed.
2:30pm- manhole now stacked out.
4:00pm- loosing material with breaker due to smaller excavator being used. Still digging to lay 1st joint downstream of manhole.
4:48pm- joint now placed.
5:07pm- barricades are up as crew is calling it a day.