Turkey Creek Ph 2 - Interceptor


Crew will start laying pipe again today at MH E56 going downstream. 
7:42am- crew still awaiting the arrival of the excavator so that digging can begin here at MHE 56. 

7:57am- excavator has arrived. 

8:38am- digging is now underway at MH E56. 

10:27am- grade is checked at MH E56 location. More digging to occur. 



1:45pm- MH E56 base is now getting placed. 

2:30pm- manhole now stacked out. 

4:00pm- loosing material with breaker due to smaller excavator being used. Still digging to lay 1st joint downstream of manhole. 

4:48pm- joint now placed. 

5:07pm- barricades are up as crew is calling it a day. 