Crew will be gathering things to clean out pipe today between MH E2-E1.
8:35am- E2 manhole with standing water in it due to the silt backup.
9:10am- pump now running at MH E1.
9:19am- a jetter is going to be needed to properly clean pipe. FlatCreek is going to try and hire one to do it.
11:17am- crew will enter MH E24 now to begin cleaning a section of pipe upstream.
12:39pm- bucket and ropes being used to remove debris from line at this time.
1:09pm- a lot of gravel has been pulled from pipe now.
More to come.
3:37pm- first round of gravel was raised from MH E24 and crew wanted a break from that, so now they are at MH E47 continuing with grouting.
4:56pm- MH E47 almost grouted now. This will round out the day here.