Turkey Creek Ph 2 - Interceptor

Image
Seed and straw going down today on Rittenhouse under bridge today to clean up areas affected by testing  

Turkey Creek Ph 2 - Interceptor

Image
More gate work has been done today.  Gate at top of access at Bridge: Gate at bottom approaching sewer easement from Bridge Access: Gate under bridge over sewer easement: I have requested that this gate be leveled along with right side brace bar.  Gate at south end of Rittenhouse property at MH E32 still needs to be welded up.  A look up at Tinker/Journagan gate crossing. A little off looking with cross slope and steep grade…

Turkey Creek Ph 2 - Interceptor

Image
Crew has set MH E56 ring and lid this morning and done a vacuum test on MH E56 with it passing the minute test. 

Turkey Creek Ph 2 - Interceptor

Image
Met with Dennis onsite today to discuss the fencing and gates that he is working on. Placement of the Rittenhouse gates; one at bridge and one at south end of property at MH E32 location.  One gate to be installed at top of roadway at bridge entrance for TCRSD Access.  Also, one near bottom of roadway at a 90* to the fence line under the bridge.  One getting installed at the Journagan/Tinker old fence line near MH E34. 

Turkey Creek Ph 2 - Interceptor

No work today- Contractor attempting to get seed and straw scheduled, waiting on MH E56 ring and lid; and getting ready to do property owner requested extra work on road 3 from Ph 1 project.   Currently scheduled for Thursday of this week weather permitting. 

Turkey Creek Ph 2 - Interceptor

Image
No work due to rain-

Turkey Creek Ph 2 - Interceptor

Image
Contractor not working today!

Turkey Creek Ph 2 - Interceptor

Image
Contractor not working-

Turkey Creek Ph 2 - Interceptor

Image
No work today… contractor not able to do anything due to ground being wet and lid not being in for MH E56. 

Turkey Creek Ph 2 - Interceptor

Image
No work today. To wet. 

Turkey Creek Ph 2 - Interceptor

Image
No work today due to rain. 

Turkey Creek Ph 2 - Interceptor

Image
Ace pipe to resume camera and mandrel work today and should finish up.  7:41am- Camera going in at MH E3 headed to E5.  8:25am- camera is at MH E5 to pull mandrel back to E3.  9:16am- mandrel back at E3 now.  9:22am- camera going in at E1 to head to E3 to pull mandrel back.  There is standing water in E1 due to the flushing of the pipe and ball being in downstream pipe to keep sewer gases from entering new line.  9:48am- camera now at E3 to pull mandrel back to E1.  10:30am- mandrel is between E2 and E1 manholes and has become stuck. Crew tried to pull it back, but to no avail.  I have contacted FlatCreek for assistance in getting mandrel out.  12:32pm- mandrel now at MH E1 from E3. Some sandy grit had mandrel stopped and FlatCreek crew went in pipe and dislodged it.  All line testing now completed.