Turkey Creek Ph 2 - Interceptor


Ace pipe to resume camera and mandrel work today and should finish up. 
7:41am- Camera going in at MH E3 headed to E5. 

8:25am- camera is at MH E5 to pull mandrel back to E3. 

9:16am- mandrel back at E3 now. 

9:22am- camera going in at E1 to head to E3 to pull mandrel back. 

There is standing water in E1 due to the flushing of the pipe and ball being in downstream pipe to keep sewer gases from entering new line. 

9:48am- camera now at E3 to pull mandrel back to E1. 

10:30am- mandrel is between E2 and E1 manholes and has become stuck. Crew tried to pull it back, but to no avail. 
I have contacted FlatCreek for assistance in getting mandrel out. 
12:32pm- mandrel now at MH E1 from E3. Some sandy grit had mandrel stopped and FlatCreek crew went in pipe and dislodged it. 

All line testing now completed. 